Distributed Antenna System Installation | UCDH North Addition Office Building
M+A provided expedited design, obtained agency approval, and construction documentation services associated with the installation of a new Distributed Antenna System. M+A conducted thoughtful and thorough upfront planning to ensure the design met the needs of our client and worked with the existing structure. The entire project cycle lasted a little over a year, from the initial design to substantial construction completion.
Client: UC Davis Health
Project Size: 500 square feet
Completed: 2020
Permit Approval process: UCDH In-house
Campus Photo: ©UC Regents
M+A provided expedited design, obtained agency approval, and construction documentation services associated with the installation of a new Distributed Antenna System. M+A conducted thoughtful and thorough upfront planning to ensure the design met the needs of our client and worked with the existing structure. The entire project cycle lasted a little over a year, from the initial design to substantial construction completion.
Client: UC Davis Health
Project Size: 500 square feet
Completed: 2020
Permit Approval process: UCDH In-house
Campus Photo: ©UC Regents
M+A provided expedited design, obtained agency approval, and construction documentation services associated with the installation of a new Distributed Antenna System. M+A conducted thoughtful and thorough upfront planning to ensure the design met the needs of our client and worked with the existing structure. The entire project cycle lasted a little over a year, from the initial design to substantial construction completion.
Client: UC Davis Health
Project Size: 500 square feet
Completed: 2020
Permit Approval process: UCDH In-house
Campus Photo: ©UC Regents